Prefabricated house quick-build steel frame modular prefabricated villa

Product Description Prefab HousePrefab house is the shortened form of Prefabricated House. The main materials of Prefab house are light steel, PVC sliding window, glass wool, EPS panel, galvanized purlin, glass wool insulation, fiber cement board, rubber/ laminated flooring, steel door, SIP door, steel security window

Featured Products

Product Description
 

Prefab House

Prefab house is the shortened form of Prefabricated House. The main materials of Prefab house are light steel, PVC sliding window, glass wool, EPS panel, galvanized purlin, glass wool insulation, fiber cement board, rubber/ laminated flooring, steel door, SIP door, steel security window grill, decorated ceiling, glass wool insulation, etc. Reinforced with anti-stain processed steel bar.

We can provide design, planning, construction and installation of one- step service & guide  the installation. Coperate with us, you can get high quality with reasonable price, lower cost, customized service.

"the first loyalty and service first, the real good news. " is our philosophy. Let's cooperate to create mutual benefit and bright future.

Production line
Assembled House Fast Build Steel Frame Modular Prefabricated Villa

 

Product usage

Assembled House Fast Build Steel Frame Modular Prefabricated Villa
 

 

Product Specification 

Assembled House Fast Build Steel Frame Modular Prefabricated Villa
Assembled House Fast Build Steel Frame Modular Prefabricated Villa
Assembled House Fast Build Steel Frame Modular Prefabricated Villa
 


 

 


Packaging & Shipping


Pakaging and Shipping
Assembled House Fast Build Steel Frame Modular Prefabricated Villa
 

 
  FAQ

Q: What about the Month Capacity?

A: Prefab House: 100,000m2 ,Container house: 400 Units, Steel structure: 2000tons, Villa: 100,000m2.

Q: What's the minimum order?

A: Prefab house: 60m2, Container house: 3 Units, Steel structure: 200m2, Villa: 100m2.

Q: How about your delivery time?

A: Normally, the delivery time is as follows:
 Prefab house: 20-25days, Container house: 315-20days, Steel structure: 25-30days, Villa: 30-35days.

Q: What's your payment terms?

A: T/T or L/C.

Q: What is your package?

A: Contains house is in flat pack, other house will be loaded into shipping cpntainers.


Contact us

   Assembled House Fast Build Steel Frame Modular Prefabricated Villa    Eastland Building Materials Ltd
 
 
Address: 2404, Building 4, No. 37 Pukou Avenue, Nanjing, China




   
Web: chensco1.en.made-in-china.com                                                             
                                                                                                                             




 
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours